Vinyl siding starter strips.
How to start vyinl siding.
This is our most comprehensive.
Install flashing before starting to apply the siding.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Remove any siding or exterior finish that isn t compatible with vinyl siding and make sure the walls are sheathed with a substrate to receive the siding.
Not just another vinyl siding installation video.
Unless already installed a water resistive barrier should be applied to the house prior to installing vinyl siding.
Utility knife score panel with knife then bend the vinyl back and forth until it snaps cleanly on the scored line.
Consult your local.
Starting with the soffit nail.
Power saw bench or radial arm saw.
When installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
We cover how to move doors and windows and create a weather proof exterior.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
When cutting vinyl siding it s usually to go into a corner.
If you don t cut your siding short when it expands in the summer it s going to buckle.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
1 2 inch 1 3 cm plywood or osb are common substrates and these are generally covered with roofing felt or another moisture barrier prior to siding the walls.
A flat level wall surface is necessary for proper installation of vinyl siding.
All vinyl siding and vinyl soffit and fascia can be cut with tin snips a circular saw with a plywood blade or by scoring it with a knife and breaking it.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
Aviation tin snip start cutting at the top interlock and continue toward the bottom of the panel.
This is where the new siding will begin.