And in this one sentence lie the benefits and the detriments we face in the roof curb business everyday.
How to set a roof curb.
After leveling the curb we anchored the curb down with 4 screws to the metal sub roof.
Pressure treated nailers should be provided by the curb manufacturer to receive roofing felts and eliminate noise transfer.
After the opening was made for the duct work we then placed the curb in position.
Roof curbs allow the installation of the primary roof and the flashings around this roof curb prior to the delivery of the actual roof equipment and the setting of this equipment.
Roofi ng may be completed after setting the unit.
Curbs should be a minimum of eight inches above the finished roof and factory insulated to reduce condensation.
The primary function of the curb is to keep weather out while supporting flashing the equipment on it.
The rooftop unit may be mounted immediately after the curb is installed.
Specify prefabricated roof curbs and related products by a roof curb manufacturer not with or by the equipment manufacturer.
The opening through the metal roof was for the intake duct to the a c unit.
Curb installation should be a part of the roof deck not on top of insulation or roofing materials.
Prior to setting the unit onto the curb the installer should ensure that a sealing material is positioned between the unit and the curb to provide a watertight connection.
Specify prefab roof curbs for use with all roof penetrations and roof mounted equipment including and not limited to hvac units duct openings pipe penetrations power roof exhauster intake and relief vents flues or job fabricated items.